ACTION REQUESTED:
Title
Communication from the City Manager and Interim Director of Public Works with a Request to ACCEPT the LOW BID of STARK EXCAVATING, INC. and Award a Construction CONTRACT, for a Total Award Amount of $318,149.70, from the Base Bid of $289,227.00 plus an Additional 10% Contingency, for the EAST OAK CLIFF CULVERT REHABILITATION PROJECT. (Council District 3)
Body
BACKGROUND: Oak Cliff Court is the only road leading into and out of a residential area. The two 96 inch corrugated metal pipes are in poor condition and are failing, and the slopes in the creek near the pipe are eroding. The slope erosion is causing the edge of the road to erode and fail.
The proposed project consists of inserting liners into the two 96 inch culverts, constructing a cast-in-place reinforced concrete headwall, installing riprap to armor the portions of the creek immediately upstream and downstream of the culverts, adding a gravel shoulder to the road and other miscellaneous improvements.
The project was budgeted in 2018. Design started in 2018, but construction has been delayed until 2019 due to issues with acquiring the right of way and easements needed for the project.
Bids were received and opened on May 23, 2019 with 2 bidders submitting, as below:
Contractor Base Bid Amount
STARK EXCAVATING INC $289,227.00
ILLINOIS CIVIL CONTRACTORS, INC $ 316,381.00
Stark is a local business that has successfully performed work for the City in the past. The project is small and most of the work is installing the culvert liners. This means there are not many opportunities for subcontracting work. The Good Faith Efforts documentation submitted by Stark were reviewed and approved. The Company will utilize 0.21% WBE’s for traffic control, 5.08% for guardrail and will make a good faith effort to reach the 18% minority utilization and 3% female utilization for workforce hours on the project.
FINANCIAL IMPACT: This construction contract was budgeted in Project CSO182 in the 2018 Community Investment Plan.
NEIGHBORHOOD CONCERNS: Storm water infrastructure failures are a safety issues for the public. If these culverts were to fail, the road could fail and access to the residential area would be restricted.
IMPACT IF APPROVED: City storm water infrastructure will be repaired.
IMPACT IF DENIED: City storm water infrastructure will not be repaired.
ALTERNATIVES: N/A
EEO CERTIFICATION NUMBER: Stark Excavating has current EEO #02373-190630.
WHICH OF THE GOALS IDENTIFIED IN THE COUNCIL’S 2014 - 2029 STRATEGIC PLAN DOES THIS RECOMMENDATION ADVANCE?
1. Financially Sound City Government, Effective City Organization
2. Attractive Neighborhoods with Character: Safe and Livable
WHICH CRITICAL SUCCESS FACTOR(S) FROM THE COMPREHENSIVE PLAN DOES THIS RECOMMENDATION IMPLEMENT?
1. Invest in our infrastructure and transportation.
2. Reinvest in neighborhoods.
3. Have an efficient government.
DEPARTMENT: Public Works