File #: 22-396    Version: 1 Name: Abington and Madison Pipe Culvert Replacement
Type: Agreement Status: Approved
File created: 10/24/2022 In control: City Council
On agenda: 11/22/2022 Final action: 11/22/2022
Title: Communication from the City Manager and Director of Public Works with a Request to APPROVE an AGREEMENT with STARK EXCAVATING, INC. for the ABINGTON AND MADISON PIPE CULVERT REPLACEMENT, for $779,943.50 with an Additional Authorization of $116,991.50 (15%) for Contingencies, for a Total Amount of $896,935.00. (Council District 3)
Attachments: 1. 22-396 signed
ACTION REQUESTED:
Title
Communication from the City Manager and Director of Public Works with a Request to APPROVE an AGREEMENT with STARK EXCAVATING, INC. for the ABINGTON AND MADISON PIPE CULVERT REPLACEMENT, for $779,943.50 with an Additional Authorization of $116,991.50 (15%) for Contingencies, for a Total Amount of $896,935.00. (Council District 3)

Body
BACKGROUND: In October 2019 when inspecting an erosion problem near the railroad crossing on Abington Street near Madison Avenue, City staff found an existing 8-foot diameter pipe culvert crushed and full of debris that was obstructing flow stream flow. The drainage repair contractor removed the debris and removed the damaged pipe. A temporary repair installed a 42" pipe and a 30" pipe to convey the water until a permanent fix could be designed. In March 2020, a large storm event caused water backup and flooding of adjacent properties. The City's drainage repair contractor then removed the previous temporary installation and installed a 6-foot diameter pipe. That repair has held up while finalizing the design and securing property to replace the original culvert.

This Stormwater Utility-funded capital improvement will remove the temporary culvert and install a new 8-foot square concrete box culvert that will connect to the existing arch culvert under the railroad. Hanson Professional Services prepared the plans and contract documents.

Bids for the Abington and Madison Pipe Culvert Replacement Project were advertised in the Peoria Journal Star and on the City's website. Bids from two qualified bidders were received and opened on October 25, 2022. Both bidders submitted alternate bids as required by the contract documents as follows:

Contractor
96" Dia. Pipe Culvert
8'x8' Box Culvert
Stark Excavating
$984,072.00
$779,943.50
Knapp Construction
$1,432,918.40
$1,357,578.50
Engineer Estimate
$905,927.00
$806,187.00

The construction contingency on this project is 15% instead of the normal 10% because Public...